China / Data center

500 kW liquid-cooled data-center integration

A 23-cabinet data hall in Nanjing with two CDUs, the piping network, in-row air conditioning, power monitoring and environmental monitoring delivered as one integration scope.

Enclosed aisle of black server cabinets on a raised floor, with a wall-mounted monitoring display at the aisle end.
PhotographCompleted installation, Nanjing.
Cooling scale
500 kW
Racks
23
Architecture
Two CDUs with in-row air conditioning for residual heat
Region
China
Client
Data-center operator, Nanjing

Challenge

Liquid cooling removes most of the server heat, but the hall still needs air cooling for the remainder and one monitoring view across both.

System architecture

Two CDUs serve the liquid loop, seven in-row units handle residual air-side heat, and power and environmental monitoring were included in the same scope.

  1. 23Server cabinets
  2. 7In-row air conditioners
  3. 2CDU
  4. 1Piping network
  5. 1Electrical power monitoring system
  6. 1Monitoring system

LINKWAVE scope

  • Server cabinets23
  • In-row air conditioners7
  • CDU2
  • Piping network1
  • Electrical power monitoring system1
  • Monitoring system1

Engineering highlights

  • Two CDUs on a shared piping network.
  • Liquid and air cooling delivered in one scope.
  • Power monitoring and environmental monitoring integrated.

Delivery

Installed and commissioned on site in Nanjing.

Planning something similar?

Share the load, rack count and site constraints. An engineer will respond with an architecture and the questions that need answering.